Background 1

  • Form up a casting deck
  • Install the prefabricated galvanised cone sump
  • Fix and tie steelwork reinforcement as per design drawings
  • Install internal and external formwork
  • Pour concrete and finish as required
  • Once cured remove all formwork and crane the sump into position