Background 1

  • Diamond grind the concrete in preparation for the new cementitious underlay
  • Formwork and high pins installed to allow for continuous pouring of the floor
  • Mixing and pumping of Fosroc Cemtop XD cementitious leveling compound to level the lower section of the floor to match internal floor height